| Project
highlights |
|
|
Designed and currently implementing a 3,400-ton
Central Chilled Water Plant replacement and upgrade
project for San
Diego Convention Center that will produce anticipated
annual energy savings of $365,000 for the customer.
The project scope includes total system automation,
commissioning, refurbishing of cooling towers, piping,
pumps and variable frequency drives in a fully occupied
facility. |
|
|
Designed and engineered a 400 KW Cogeneration plant
with 100 Ton Absorption Chiller for 200,000 square
foot office tower. |
|
|
Designed and constructed a large 350KW back-up power
plant for multi-facility national corporation. |
|
|
Three-year project that includes benchmarking State
owned and operated facilities, providing operational
standards for each facility, and implementing electronic
utility tracking system. |
|
|
Conducted facilities engineering and operations
analysis and created an overall operational budget
model for use by client in evaluating and acquiring
a premiere 3 million square foot office complex
located in downtown Boston. |
|
|
Designed and installed a 60 KW back-up power plant
for critical call center for airline company. |
|
|
Completed
lighting retrofit for 500,000 square foot facility
in downtown Los Angeles. |
|
|
Designed
and engineered 1 Megawatt Cogeneration plant for
Torrance facility with 250 Ton Absorption Chiller.
|
|
|
Designed
and engineered a 10 Megawatt Trigeneration plant
for headquarters of leading aerospace industry firm
in El Segundo. |
|
|
Designed
and currently implementing an HVAC & EMS retrofit
including our proprietary advanced EMS sequencing
software system for commercial real estate development
facility. |
|
|
Conducting
comprehensive energy audit of 3 million square foot
office tower in downtown Los Angeles. |
|
|
Designed,
engineered and constructed a 5.2 Megawatt Cogeneration
plant for California state prison. |